Secondary Sewer TS1.282.12 (ID200 DWC-HDPE)- Installation of precast concrete rings in progress

Trunk Sewer TS1-1 (ID200 DWC-HDPE)- Trenching and bedding preparation in progress

Trunk Sewer TS1-1 (ID200 DWC-HDPE)- Precast concrete manhole with benching in place

Secondary Sewer TS1.282 (ID200 DWC-HDPE)- Pipelaying, jointing and backfilling in progress

Secondary Sewer TS1.282 (ID200 DWC-HDPE)- Installation of precast concrete manholes in progress

Manufacture of precast concrete manhole rings, roof slabs and base slabs at Contractor’s Camp in Kairuni, Chogoria