Secondary Sewer TS1.282.12 (ID200 DWC-HDPE)- Installation of precast concrete rings in progress
Trunk Sewer TS1-1 (ID200 DWC-HDPE)- Trenching and bedding preparation in progress
Trunk Sewer TS1-1 (ID200 DWC-HDPE)- Precast concrete manhole with benching in place
Secondary Sewer TS1.282 (ID200 DWC-HDPE)- Pipelaying, jointing and backfilling in progress
Secondary Sewer TS1.282 (ID200 DWC-HDPE)- Installation of precast concrete manholes in progress
Manufacture of precast concrete manhole rings, roof slabs and base slabs at Contractor’s Camp in Kairuni, Chogoria