DSCN0423 Meru Sewerage Project works Meru Sewerage Project Anaerobic pond 1 slopes formation in progress at Meru (Rwanyange) Sewerage Treatment Works Site. Compaction of Maturation ponds bottom level in progress at sewerage treatment plant Kiogo Trunk Sewer main Pipe installed and Backfilling Mpuone trunk sewer line pipe installation for Meru sewerage project Resident Engineer Eng. Nimrod Tuiya Taking the TWWDA board members and staff through Meru (Rwanyange) Sewerage Treatment Plant components. Roller compacting the Base maturation ponds Album navigationPreviousPrevious album:Marsabit ProjectsNextNext album:Tharakanithi Projects